Project Type: Traffic/ITS

George Washington Bridge Barrier Replacement at Trans Manhattan Expressway

New York, New York

Arora and Associates, P.C. providied traffic engineering design services for traffic and MOT tasks on Trans Manhattan Expressway Median Barriers and Water System ‘C’ Rehabilitation project. Arora consulted on median barrier safety shape to be installed during project. Arora designed two overhead sign panels for approach into Manhattan. Arora performed a sign inventory and produced plans for replacement of column mounted signs along TME. Arora designed pavement markings including exit lane striping and pavement marking words. Arora developed MOT plans for closure of lanes for column repairs, barrier installation and water system installation. MOT plans included approaches to TME from GWB, Cross Bronx Expressway, Harlem River Drive, Henry Hudson Parkway, Riverside Drive and approaches to GWB from NJ. Project was delivered on time and within allocated budgets.