Project Type: Hydrologic / Hydraulic Engineering

Garden State Parkway Widening, MP 70 to 75

New Jersey

Arora, as a subconsultant, was responsible for the delivery of 2 miles of the widening within this section from 2-lanes mainline to 3 lanes in both travel directions. Specific work within this sub-section included horizontal and vertical alignments, roadway sections and cross sections, sign structures, signing and striping plans, drainage and water quality designs, supplemental survey, construction contract documents, and construction support services. The Project required: highway and roadside safety design including assessing needs for guide rails and Length of Needs, establishing Clear Zone, highway lighting, signing and striping, construction staging. Project was designed and delivered in accordance with the NJTA Design Manual, Traffic Control Manual, Design Standards, Standard Plans and Specifications.